The Polywater Front End Pack (FEP) is a plastic, lubricant filled bag. It is designed to lubricate ahead of the cable during the pull, minimising friction where it is needed most.
The Front End Pack lubricates far into the conduit where normal lubrication methods will not reach. This reduces the number of inspection/lubrication points needed during the pull. The lubricants reach into the bends of heavy HV cable pulls ensures that cable and sidewall tensions are minimised where needed most.
Polywater Lubricant J is a high performance, clean, slow-drying, water-based gel lubricant. Lubricant J provides maximum tension reduction in all types of cable pulling. It is especially recommended for long pulls, multiple-bend pulls and pulls in a hot environment. Lubricant J dries to form a thin lubricating film which retains its lubricity for months after use.
The Front End Packs are filled with Polywater J Lubricant which is a high performance, clean, slow-drying, waterbased gel lubricant. Polywater J Lubricant provides maximum tension reduction in all types of cable pulling. It is especially recommended for long pulls, multiplebend pulls and pulls in a hot environment.
Lubricant J dries to form a thin lubricating film which retains its lubricity for months after use.
Installation of Front End Packs is very simple
Polywater Lubricant J is a specification-grade lubricant that does not promote flame propagation when used with fire-retardant cables and systems. It is harmless to humans, environmentally safe, compatible with common Australian cable jacket materials, and can be easily applied as part of the unique Polywater® Lubricant Application System.
Part # | Description | Extra Details |
---|---|---|
J-DRUM | 208L Drum | - |
J-640 | 18.9L Drum | - |
J-128 | 3.8L Bucket | - |
J-110 | 1.9L Front End Pack | 76mm diameter x 36mm long - suitable for conduit larger than 75mm |
J-99 | 0.95L Front End Pack | 44mm diameter x 60mm long - suitable for conduit up to 75mm |
(Front End Pack™is a conduit-sized polyethylene bag of lubricant. The Front End Pack™travels through the conduit on the winch line prelubricating the conduit ahead of the cable being pulled.)
Ask us about a demonstration of the American Polywater Pull-Planning Software that calculates pull tension volume of your lubricant required and ensures you maximise your productivity and profitability.