LV Temporary Crossarm - Lifting
Designed to support LV conductors while a wooden crossarm is removed and replaced. Developed in conjunction with a leading Australian utility, it enables the changeover operation to be carried out quickly and safely while the line remains live. Lifting mechanism of a lifting bracket involves a lifting rachet and insulating fibreglass supports that can lift the firbreglass crossarm up to 380 mm.
Benefits
Part # | Arm Length | Weight | Number of Attachments | WLL per Attachment |
---|---|---|---|---|
LVTC-2.7-5O | 2.7m | 15.8kg | 5 | 1.37kN |